A brilliant piece of teamwork at Taveirne: renewing the tracks in front of the Docks shopping centre and on the SPRB's new bridge.
Major works at the port of Zeebrugge are nearing completion. Only finishing works are scheduled for September.
Two additional tracks are being laid on Belgium’s busiest railway line (L50), between Ghent and Bruges.SNCB is already integrating the new tracks into the June timetable, which will lead to smoother and more punctual train connections.
From March to the end of July 2023, Taveirne renewed the tramline tracks between the Schaarbeek depot and central Brussels.
During the summer of 2023, Taveirne renewed the line between Schaerbeek station and central Brussels on behalf of STIB, track type jaquette.
In Lot, borough of Beersel, 2 switches were renewed last weekend. Our PEM LEM lorries were used to carry out this work.
In opdracht van De Lijn Interventie na breuk in het spoor naar de brug aan de Demeysluis, Oostende
Switches were placed at the Gent Sint-Pieters yard last month in anticipation of the construction of platform tracks 6 and 7.
In early May, Taveirne could be seen at work on a site in Forest installing 4 concrete points and 2 derailment needles.
On site in Brussels, Taveirne was responsible for renewing 120 m of track and installing a switch.
On site in Brussels, Taveirne was responsible for renewing 120 m of track and installing a switch.
Renewal of points and track equipment. Also construction of the track.
Quai 745 à Gand Ce projet comprenait : Remplacement des rails/interrupteurs Remplacement de la sous-couche sur une ferme OC Placer des blocs de légion sur une voie principale à Gand afin que cette voie puisse être déplacée ultérieurement.
In Nivelles, Taveirne was in charge of renewing 2 x 750 m of tracks and extending 2 platforms. On behalf of TUC rail
At Brussels South Station, Taveirne was in charge of renewing the switches and tracks.
Taveirne renewed the tracks and switches along the Forest line on behalf of Infrabel.
Taveirne was in charge of laying new tram tracks in Schaarbeek, with exchange beams on concrete support. All together on a vibration-free slab.
In collaboration with Stadsbader and Artes, Taveirne installed the tram tracks on the New Theunis Bridge, near the Sportpaleis in Antwerp
Taveirne carried out groundworks at Ghent-Sint-Pieters station during the night in early November. A concrete switch of about 70m was also installed.
Taveirne is currently working on the first phase of the complete renewal of the tram tracks in Zeebrugge.
In cooperation with De Vlaamse Waterweg nv and Infrabel, a new tunnel was pushed under the railway line at De Beukelaer-Pareinlaan in Herentals during the weekend of 9 and 10 July.
Commissioned by Infrabel, Taveirne renewed the tracks and level crossings along the route of Melle.
Installation of new tram tracks in General Jacques Avenue, between the corners of Sterreplein and Boondaalsesteenweg, incl. the beginning of Buyllaan and Renbaanlaan.
Complementary works at renewing sleepers with track renewal train P93 and sifting ballast with
ballast-sifting-train C75 at several locations in the area NW Ghent.
Renewing railroad crossings.
Renewing (ballast, sleepers and rails) main tracks.
Construction of the new tram depot involves 8 tracks where a total of more than 60 trams can be stationed.
In commission of Cordeel
The project Line 9, is an ambitious project realized in corporation with the STIB, Brussels Capital Region, Beliris and Jette.
Railway line over 850 m double track with six switches, two crossings, 5 rail assembly systems and the control of the switches.
Removing the old tracks and constructing a new railway line.
Under contract to De Scheepvaart
Installation of tracks and catenaries for the high-speed line section between Liège and the German border.
Renovation of a single track section between the terminus of Lille Flanders station and Croisé Laroche, 4 km containing 9 stations.
The whole project entails laying around 13.5 km of single track on concrete, and around 1.5 km of ballast single track.
Under contract to Tec
Laying of 3,610 m of single tram tracks situated at Anvenue Louise, from Place Stéphane to Rue Lauters.
Under contract to MIVB/STIB
Renewal of the double track including road crossings, and points and crossings, improvement of the track foundation, adaptation of the signalling …
Under contract to De Lijn
Construction of the tracks and points and crossings, including both drilled shafts.
Under contract to TUC RAIL
The removal, installation and renewal of points and crossings, tracks on the main and secondary track
Under contract to Infrabel
Renewal and creation of 1,700 m of single tram track and of a track connection at Avenue de la Chasse and Place Saint-Pierre in Ittre.
Under contract to STIB/MIVB
Renewal of tracks, execution of road surface works and also cable works
Under contract to AWV