Extension of the tram line 4 to campus UZ Ghent

Extension of the tram line 4 to campus UZ Ghent

In commission of Heijmans Infra

This work included:
Track-, road- and sewerage works and civil works (traction station and louver)

This project involves: construction of roads, sewerage, a building for a traction station, louver, tracks, controls, overhead wires and all accessories within the project on the Galglaan, De Pintelaan, and on the site of UZ Ghent.

The TTA (with Taveirne & Frateur-De Pourcq) realized the railway line over 850 m of double track with 6 switches and 2 crossings, 5 different rail assembly systems and the complete control of the switches, track signalling and overhead wires.