New rail tracks Brussel Zuid – Brussel Klein eiland
18 January 2016

Taveirne was commissioned by Infrabel and has started the renewal of the rail tracks on the route between Brussel Zuid and Brussel Klein Eiland.

The work includes the removal of the existing tracks, ballast and underlay, renewing the waterproof edge on bridges and then the construction of a shock-absorbing carpet, new underlay, ballast and rail tracks. At the height of the car wash the tracks are installed on a concrete structure.