Aalter-Bellem: Installation of three P1150 turnouts

Aalter-Bellem: Installation of three P1150 turnouts

During the weekend of 8 and 9 November Taveirne installed three P1150 turnouts at the Aalter-Bellem worksite on the Ghent–Ostend line.

These high-capacity turnouts are designed for intensive rail traffic and contribute to a smooth, safe, and durable railway infrastructure.